Punjab Minister Directs Accelerated Infrastructure Work on Development Programme

Punjab Local Government Minister Zeeshan Rafiq has ordered accelerated infrastructure development on Phase II of the Punjab Development Programme following the conclusion of Phase I.

Share:WhatsAppX / PostFacebookLinkedIn
CommentsAdd to Preferred Sources
Punjab Minister Directs Accelerated Infrastructure Work on Development Programme — Newsbeat pakistan coverage
Punjab Minister Directs Accelerated Infrastructure Work on Development Programme — Newsbeat Pakistan Desk
Key Takeaways
  • Phase I successfully completed 124 kilometres of drains alongside 109 water tanks across 51 cities.
  • Phase II features the construction of 150 kilometres of sewers and 153 public parks.

ISLAMABAD — Punjab Local Government Minister Zeeshan Rafiq has directed officials to accelerate infrastructure development on Phase II of the Punjab Development Programme (PDP) following the successful completion of Phase I. Chairing a review meeting in Lahore on Saturday, the minister evaluated ongoing municipal projects alongside Punjab Local Government Secretary Zaid bin Maqsood, Additional Secretary Mehreen Faheem Abbasi, and relevant municipal officers participating via video link.

Highlighting the scope of completed and ongoing works, the minister noted that 109 water tanks have already been constructed across 51 cities under the "Maryam Nawaz’s Sohna Punjab" initiative, boasting a combined rainwater storage capacity of 24 million gallons. Furthermore, Phase I successfully delivered 124 kilometres of drains, while Phase II currently entails the construction of 150 kilometres of sewers and the rehabilitation or construction of 153 public parks.

The administration is also bolstering municipal operations by supplying 217 units of modern machinery for drainage and desilting purposes across the 51 designated cities under Phase II, bringing the overall allocation to 287 new pieces of machinery. Future project stages outlined during the briefing include the laying of 330 kilometres of sewer lines and the construction of 326 kilometres of streets and roads in subsequent phases, alongside the installation of 2,000 manhole covers across various urban centers.

Addressing technical execution, local government authorities issued strict directives regarding civil engineering standards on public thoroughfares. The department mandated that the construction of manholes directly in the middle of roads must be avoided wherever possible, emphasizing strict adherence to official compliance instructions across all municipal infrastructure sites.

Reader Discussion (0)

MODERATED · NO LINKS OR SPAM
0/500 characters

Loading reader comments...

Most Popular

TOP READS ACROSS NEWSBEAT
01
Craft Anything moves software inspection onto your own machine — Newsbeat technology coverage
Craft Anything moves software inspection onto your own machine
02
Why Pakistan's digital news ecosystem needs source-verifiable reporting over viral speed traps — Newsbeat opinion coverage
Why Pakistan's digital news ecosystem needs source-verifiable reporting over viral speed traps
03
EVs to Replace Sindh Govt's Official Vehicles — Newsbeat pakistan coverage
EVs to Replace Sindh Govt's Official Vehicles
04
Punjab’s Wheat Cultivation Surges as Province Reaches 51% of Target — Newsbeat pakistan coverage
Punjab’s Wheat Cultivation Surges as Province Reaches 51% of Target
05
Balochistan Assembly Rejects Resolution to Abolish Tribal System — Newsbeat pakistan coverage
Balochistan Assembly Rejects Resolution to Abolish Tribal System
06
10 New Electric Bikes and Scooters Launched in Pakistan — Newsbeat pakistan coverage
10 New Electric Bikes and Scooters Launched in Pakistan

Latest Stories

ALL LATEST →