ISLAMABAD — Residents across multiple neighborhoods in Pakistan's largest metropolis continued to face severe water shortages on Sunday for the third straight day, despite official claims by municipal authorities that city-wide supply networks had been fully restored following scheduled infrastructure maintenance.
The Karachi Water and Sewerage Corporation (KWSC) previously announced that extensive annual repair operations beginning November 13 would temporarily slash municipal water availability by approximately 130 million gallons per day (MGD). In a subsequent update, the utility confirmed that all 21 heavy-duty pumps at the critical Dhabeji pumping station were back online.
According to municipal engineers, the multi-day engineering intervention included critical upgrades such as the installation of a new 60-inch-diameter valve at Dhabeji, comprehensive repairs across all pump houses at the Pipri facility, the replacement of a 150-foot water pipeline segment along Shahrah-i-Bhutto, and the plugging of leaks within the Haleji conduits to secure long-term system efficiency.
While the utility stated that water delivery to dense urban zones like Landhi, Korangi, Malir, and Shah Faisal towns was being gradually reintroduced, officials refrained from providing a definitive timeline for when residential taps would return to normal pressure and availability.
